Cismac Electronique > Hydropower® Applications > exemple #3

Example of installation in end of the rising main
previous example - next example

Turbine HPW125-B is installed in the reservoir, at the end of the rising main, easily accessible by the service ladder. The flow is of 110 m3/h (30 l/sec) during 10 à12 hours per day. Hydraulic connection is made by a support DN125.

The produced electric power is stored by the battery of device HYDROPOWER to feed permanently, of 24 V DC, a of radio teleprocessing satellite and a measurement probe of water height.

top ©1998-2002, Cismac Electronique