Example of installation on a rising main
previous example - next example

Turbine HPW110-A is set up on the filling main of the tank, by pressure from the pumping station. The flow is 80 m3/h (22 l/sec) during 6 to 8 hours per day. Hydraulic connection is made by 2 supports DN100.

The produced electric power is stored by the battery of device HYDROPOWER to supply permanently a teleprocessing satellite and a measurement probe of water height.